Customization: | Available |
---|---|
Warranty: | 1 Year |
Certification: | ISO9001, TUV, GMP, ISO, CE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Full automatic carton stitching folding gluing machine mainly composed of four parts:paper feeding section,folding
section,stitching gluing pressing section,counting stacking section,digital display speed adjustment,microcomputer amplitude adjustment,with a simple fast reliable and precise control mode.Automatic paper feeding,automatic gluing and folding,automatic counting,automatic stacking output, the average gluing speed is 150 sheets/min,the maximum speed gluing speed is 220 sheets/min,and the stitching box speed is 50 sheets/min.High efficiency, energy saving and environmental protection is our highest pursuit.
Machine Model | QS2600 | |
Gluing | Stitching | |
The max paper size(A+B)×2 | 2500mm | |
The min paper size(A+B)×2 | 420mm | 680mm |
The max length of carton A | 780mm | |
The min length of carton A | 130mm | 210mm |
The max width of carton B | 580mm | |
The min width of carton B | 80mm | 170mm |
The max height of paper (C+D+C) | 1100mm | |
The min height of paper (C+D+C) | 170mm | 300mm |
The max size of case cover C | 430mm | |
The min size of case cover C | 50mm | |
The max height D | 700mm | |
The min height D | 100mm | |
The max width of tongue | 40mm | |
The stitching distance | 30-150mnm | |
Number of nails | 1-99 | |
Wire specs | 1.85*0.75mmWidth*Thickness | |
Total power | 18HP | |
Stitching head speed | 600 times/min |
We are professional manufacturer of carton packaging machine with more than 20 years production experience.Our main product has corrugated cardboard production line,carton printing machine,carton stitching machine,foldng gluing machine etc.In the same industry in China, we took the lead get the ISO9001 certification.We also passed SGS and BV certification now. Our products sell well in more than 20 provinces nationwaide and overseas.
No. | Service |
1 | The product meets China industry standard. |
2 | The supplier provides paid service,the buyer is in charge of workers' salary, round flight tickets,living and food during the machinery installed period. |
3 | The supplier is responsible for installation and training the technician, these kinds of cost should be paid by buyer. |
4 | WARRANTY PERIOD: 12 months counting from end of debugging. |
5 | Whole Life paid service. |